We added a pantry and a desk on the far wall, and took out the wall that separated the kitchen/dining room. This really opens it up!
All our guys were awesome!!! Basically everything is done except for the texture on the ceiling and walls, and paint. Cabinets should be installed beginning Sept. 23rd. Right now we live in 1/4 inch of dust (which is why we spend all our time in the basement!) We can't wait to get this done.
2 comments:
wow.
I want to rip apart my kitchen! It turned out great guys!
Post a Comment